Coronavirus update/alternative arrangements for 2020/21

Read more

Coronavirus update for customers

NOCN Group offers a wide range of services including regulated qualifications, EPA for apprenticeships, Job Cards in construction, Access to HE Diplomas, bespoke accreditation, and educational and skills support training.

As you will be aware the government imposed a third national lockdown from Tuesday 5th January 2021. You will find out more operational detail on the implications for each of these services through the following links:

Please note that NOCN Group will be following the guidance issued by the ESFA, IfATE, Ofqual, CCEA Regulation, QAA, and Qualifications Wales, and will update our customers as things change.

If you have any concerns or would like to discuss the impact on your centre, apprentices or learners please contact us on nocn@nocn.org.uk or 0300 999 1177.

Update 29th March 2021

On 24th March, Ofqual published the VTQ Contingency Regulatory Framework (VCRF) which allows NOCN to provide centres with awarding arrangements for learners who have had their training and assessment disrupted in 2021. To view more information on the arrangements in place by NOCN, please click here.

Using Xbox to Access Online Learning

It is possible for learners to access their online work from home using a gaming console. For guidance on how to do this please download the document here.

Skip navigation

Laying Under Tile Electrical Heating Systems and Tiling Surfaces in the Workplace

Reference
A/503/2559
Level
Level 2
Credit Value
12
Guided Learning Hours
40
 
Aim
The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in laying under tile electrical heating systems and tiling surfaces in the workplace within the relevant sector of industry.


Learning Outcomes Assessment Criteria
The Learner Will The Learner Can
1 Interpret the given information relating to the work and resources when laying under tile electrical heating systems and tiling surfaces.
  • 1.1 - Interpret and extract relevant information from drawings, specifications, job details, method statements, risk assessments, control of substances hazardous to health (COSHH) assessments and manufacturers' information.
  • 1.2 - Comply with information and/or instructions derived from risk assessments and method statements.
  • 1.3 - State the organisational procedures developed to report and rectify inappropriate information and unsuitable resources and how they are implemented.
  • 1.4 - Describe different types of information, their source and how they are interpreted in relation to:
    - drawings, specifications, job details, method statements, risk assessments, COSHH assessments, manufacturers' information and wall and floor tiling recommendations.
2 Know how to comply with relevant legislation and official guidance when laying under tile electrical heating systems and tiling surfaces.
  • 2.1 - Describe their responsibilities under current legislation and official guidance whilst working:
    - in the workplace, below ground level, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting.
  • 2.2 - Describe the organisational security procedures for tools, equipment and personal belongings in relation to site, workplace, company and operative.
  • 2.3 - Explain what the accident reporting procedures are and who is responsible for making reports.
3 Maintain safe working practices when laying under tile electrical heating systems and tiling surfaces.
  • 3.1 - Use health and safety control equipment safely to carry out the activity in accordance with legislation and organisational requirements when laying under tile electrical heating systems and tiling surfaces.
  • 3.2 - Explain why and when health and safety control equipment, identified by the principles of protection, should be used, relating to laying under tile electrical heating systems and tiling surfaces, and the types, purpose and limitations of each type, the work situation and general work environment, in relation to:
    - collective protective measures
    - personal protective equipment (PPE)
    - respiratory protective equipment (RPE)
    - local exhaust ventilation (LEV).
  • 3.3 - Describe how the relevant health and safety control equipment should be used in accordance with the given instructions.
  • 3.4 - State how emergencies should be responded to in accordance with organisational authorisation and personal skills when involved with fires, spillages, injuries and other task-related hazards.
4 Select the required quantity and quality of resources for the methods of work to lay under tile electrical heating systems and tiling surfaces.
  • 4.1 - Select resources associated with own work in relation to materials, components, accessories, tools and equipment.
  • 4.2 - Describe the characteristics, quality, uses, sustainability, limitations and defects associated with the resources in relation to:
    - electric under tile heating systems
    - under-floor heating systems
    - floor tiles, grouts, adhesives, floor screeds, levelling compounds, trims, movement joints, accessories
    - hand and/or powered tools and associated equipment.
  • 4.3 - Describe how the resources should be used correctly and how problems associated with the resources are reported.
  • 4.4 - Explain why the organisational procedures have been developed and how they are used for the selection of required resources.
  • 4.5 - Describe any potential hazards associated with the resources and method of work.
  • 4.6 - Describe how to calculate quantity, length, area and wastage associated with the method/procedure to lay under tile electrical heating systems and tiling surfaces.
5 Minimise the risk of damage to the work and surrounding area when laying under tile electrical heating systems and tiling surfaces.
  • 5.1 - Protect the work and its surrounding area from damage in accordance with safe working practices and organisational procedures.
  • 5.2 - Minimise damage and maintain a clean work space.
  • 5.3 - Dispose of waste in accordance with legislation.
  • 5.4 - Describe how to protect work from damage and the purpose of protection in relation to general workplace activities, other occupations and adverse weather conditions.
  • 5.5 - Explain why the disposal of waste should be carried out safely in accordance with environmental responsibilities, organisational procedures, manufacturers' information, statutory regulations and official guidance.
6 Complete the work within the allocated time when laying under tile electrical heating systems and tiling surfaces.
  • 6.1 - Demonstrate completion of the work within the allocated time.
  • 6.2 - State the purpose of the work programme and explain why deadlines should be kept in relation to:
    - types of progress charts, timetables and estimated times- organisational procedures for reporting circumstances which will affect the work programme.
7 Comply with the given contract information to lay under tile electrical heating systems and tiling surfaces to the required specification.
  • 7.1 - Demonstrate the following work skills when laying under tile electrical heating systems and tiling surfaces:
    - measuring, setting out, cutting, applying, finishing, positioning and securing.
  • 7.2 - Position electrical under tile heating systems to horizontal surfaces to given working instructions.
  • 7.3 - Lay tile finish under tile heating systems to given working instructions.
  • 7.4 - Safely use materials, hand tools, portable power tools and associated equipment.
  • 7.5 - Safely store the materials, tools and equipment used when laying under tile electrical heating systems and tiling surfaces.
  • 7.6 - Describe how to apply safe work practices, follow procedures, report problems and establish the authority needed to rectify them, to:
    - position electrical under tile heating systems
    - confirm commission procedures for under floor heating systems
    - locate and provide movement joints
    - lay tiles over under-tile heating systems
    - lay tiles over under-floor heating systems
    - use hand tools, power tools and associated equipment.
  • 7.7 - Describe the needs of other occupations and how to effectively communicate within a team when laying under tile electrical heating systems and tiling surfaces.
  • 7.8 - Describe how to maintain the tools and equipment used when laying under tile electrical heating systems and tiling surfaces.
Assessment guidance and/or requirements
This unit must be assessed in a work environment and in accordance with the ConstructionSkills‘ Consolidated Assessment Strategy for Construction and the Built Environment.
Assessors for this unit must have verifiable, current industry experience and a sufficient depth of relevant occupational expertise and knowledge, and must use a combination of assessment methods as defined in the Consolidated Assessment Strategy.
Workplace evidence of skills cannot be simulated.

Qualifications offering this unit

Reference Title Sector Level