Coronavirus update/alternative arrangements for 2020/21

Read more

Coronavirus update for customers

NOCN Group offers a wide range of services including regulated qualifications, EPA for apprenticeships, Job Cards in construction, Access to HE Diplomas, bespoke accreditation, and educational and skills support training.

As you will be aware the government imposed a third national lockdown from Tuesday 5th January 2021. You will find out more operational detail on the implications for each of these services through the following links:

Please note that NOCN Group will be following the guidance issued by the ESFA, IfATE, Ofqual, CCEA Regulation, QAA, and Qualifications Wales, and will update our customers as things change.

If you have any concerns or would like to discuss the impact on your centre, apprentices or learners please contact us on nocn@nocn.org.uk or 0300 999 1177.

Update 29th March 2021

On 24th March, Ofqual published the VTQ Contingency Regulatory Framework (VCRF) which allows NOCN to provide centres with awarding arrangements for learners who have had their training and assessment disrupted in 2021. To view more information on the arrangements in place by NOCN, please click here.

Using Xbox to Access Online Learning

It is possible for learners to access their online work from home using a gaming console. For guidance on how to do this please download the document here.

Skip navigation

Installing Insulation to Cold Roofs in the Workplace

Reference
F/616/3938
Level
Level 2
Credit Value
18
Guided Learning Hours
60
 
Aim
The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in installing insulation to cold roofs in the workplace within the relevant sector of industry.


Learning Outcomes Assessment Criteria
The Learner Will The Learner Can
1

Interpret the given information relating to the work and resources when installing insulation to cold roofs.

  • 1.1. - Interpret and extract relevant information drawings, specifications, schedules, method statements, risk assessments manufacturers’ information and data sheets.
  • 1.2. - Comply with information and/or instructions derived from risk assessments and method statements.
  • 1.3. - Describe the organisational procedures developed to report and rectify inappropriate information and unsuitable resources and how they are implemented.
  • 1.4. - Describe different types of information, their source and how they are interpreted in relation to:
    • drawings, specifications, schedules, method statements, risk assessments, manufacturers’ information and data sheets, and current regulations governing buildings.
2

Know how to comply with relevant legislation and official guidance when installing insulation to cold roofs.

  • 2.1. - Describe their responsibilities regarding potential accidents, health hazards and the environment whilst working:
    • in the workplace, at height, in confined spaces, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting.
  • 2.2. - Describe the organisational security procedures for tools, equipment and personal belongings in relation to site, workplace, vehicles, company and operative/technician.
  • 2.3. - Explain what the accident reporting procedures are and who is responsible for making reports.
3

Maintain safe and healthy working practices when installing insulation to cold roofs.

  • 3.1. - Use health and safety control equipment safely and comply with the methods of work to carry out the activity in accordance with current legislation and organisational requirements when installing insulation to cold roofs.
  • 3.2. - Demonstrate compliance with given information and relevant legislation when installing insulation to cold roofs in relation to the following:
    • safe use of access equipment
    • safe use, storage and handling of materials, tools and equipment
    • specific risks to health
  • 3.3. - Explain why and when health and safety control equipment, identified by the principles of prevention, should be used, relating to installing insulation to cold roofs, and the types, purpose and limitations of each type, the work situation and general work environment, in relation to:
    • collective protective measures
    • personal protective equipment (PPE)
    • respiratory protective equipment (RPE)
    • local exhaust ventilation (LEV).
  • 3.4. - Describe how the relevant health and safety control equipment should be used in accordance with the given working instructions.
  • 3.5. - Describe how emergencies should be responded to in accordance with organisational authorisation and personal skills when involved with fires, spillages, injuries and other task-related activities.
4

Select the required quantity and quality of resources for the methods of work to install insulation to cold roofs.

  • 4.1. - Select resources associated with own work in relation to materials, components, fixings, tools and equipment
  • 4.2. - Describe the characteristics, quality, uses, sustainability, limitations and defects associated with the resources in relation to:
    • insulation, pipe insulation, tank and cylinder jackets, fixings and ancillary items
    • hand tools and installation equipment, portable power tools and ancillary equipment.
  • 4.3. - Describe how the resources should be used correctly and how problems associated with the resources are reported.
  • 4.4. - Explain why the organisational procedures have been developed and how they are used for the selection of required resources.
  • 4.5. - Describe any potential hazards associated with the resources and methods of work.
  • 4.6. - Describe how to calculate quantity, length, depth area and wastage associated with the method/procedure to install insulation to cold roofs.
5

Minimise the risk of damage to the work and surrounding area when installing insulation to cold roofs.

  • 5.1. - Protect the work and its surrounding area from damage in accordance with safe working practices and organisational procedures.
  • 5.2. - Minimise damage and maintain a clean work space.
  • 5.3. - Dispose of waste in accordance with current legislation.
  • 5.4. -
    Describe how to protect work from damage and the purpose of protection in relation to general workplace activities, other occupations and adverse weather conditions.

  • 5.5. - Explain why the disposal of waste should be carried out safely in accordance with environmental responsibilities, organisational procedures, manufacturers’ information, statutory regulations and official guidance.
6

Complete the work within the allocated time when installing insulation to cold roofs.

  • 6.1. - Demonstrate completion of the work within the allocated time.
  • 6.2. - Describe the purpose of the work programme and explain why deadlines should be kept in relation to:
    • types of progress charts, timetables and estimated times
    • organisational procedures for reporting circumstances which will affect the work programme.
7

Comply with the given contract information to install insulation to cold roofs to the required specification.

  • 7.1. - Demonstrate the following work skills when installing insulation to cold roofs
    • measuring, marking out, calculating, cutting, fitting, positioning and securing.
  • 7.2. - Use and maintain hand tools, installation equipment, portable power tools and ancillary equipment.
  • 7.3. - Prepare and install insulation to cold roofs using two of the following methods in compliance with current regulations and to given working instructions:
    • injected/blown
    • placed
    • mechanically or adhesively fixed
    • sprayed.
  • 7.4. - Prepare and install insulation to the following in compliance with current regulations and to given working instructions
    • pipes
    • tanks and/or cylinders
    • access hatches.
  • 7.5. - Carry out pre and post installation checks.
  • 7.6. - Describe how to apply safe, healthy and environmental work practices, follow procedures, report problems and establish the authority needed to rectify them, to:
    • understand the implications of existing guarantees and warranties
    • recognise the procedures to check flues and combustion air ventilation
    • protect access routes
    • remove obstructions and store
    • remove unwanted insulation from roof area
    • carry out pre-installation checks to include common infestations, protected species, structural integrity, dampness, vents, services (gas, electric, water, media cables)
    • check adequacy of ventilation and increase if required
    • recognise the potential risk of increased condensation following installation relating to roof coverings (pitched and flat) and roof structures (timber, metal, concrete)
    • ensure all work to services (gas, electric, water, media cables) is carried out by suitably qualified people
    • check for hidden utilities
    • identify insulation materials and their characteristics for cold roofs, pipes, storage tanks, cylinders and access hatches
    • prepare and install injected/blown, placed, mechanically or adhesively fixed and sprayed insulation to cold roofs
    • minimise the effects of thermal bridging
    • insulate up to and under existing walkway boards
    • check serviceability and provision of walkway boards
    • prepare and fix pipe, tank and cylinder insulation
    • ensure the insulation is contained within the prescribed areas
    • insulate downlighters to the required specification
    • ensure insulation around electrical apparatus will not create fire hazards (light fittings and cables)
    • restrict or reduce unwanted heat loss (down lights and other fittings)
    • maintain fire resistant barriers where appropriate
    • insulate access hatches
    • complete post installation checks
    • provide advice to preserve the integrity of the insulation (insulation data sheet and warning labels)
    • recognise when specialist skills and knowledge are required and report accordingly
    • recognise specific requirements for structures of special interest, traditional build (pre 1919) and historical significance
    • use hand tools, installation equipment, portable power tools and ancillary equipment
    • work at height
    • work in confined spaces
    • use access equipment and work platforms.
  • 7.7. - Describe the needs of other occupations and how to effectively communicate within a team when installing insulation to cold roofs.
  • 7.8. - Describe how to maintain the tools and equipment used when installing insulation to cold roofs.
Assessment guidance and/or requirements
This unit must be assessed in a work environment, in accordance with the ConstructionSkills‘ Consolidated Assessment Strategy for Construction and the Built Environment. Please refer to the hyperlink for clarity - https://www.citb.co.uk/qualifications-standards/qualification-framework/
Assessors for this unit must have verifiable, current industry experience and a sufficient depth of relevant occupational expertise and knowledge, and must use a combination of assessment methods as defined in the Consolidated Assessment Strategy.
Workplace evidence of skills cannot be simulated.
Two of the following endorsements required
- Injected/blown
- Placed
- Mechanically/adhesively fixed
- Sprayed.