Skip navigation

Reinstating the Structure after Treatment in the Workplace

Reference
H/503/2992
Level
Level 2
Credit Value
18
Guided Learning Hours
60
Grading Type
Pass/Fail
Aim
The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in reinstating the structure after treatment in the workplace within the relevant sector of industry.


Learning Outcomes Assessment Criteria
The Learner Will The Learner Can
1 Interpret the given information relating to the work and resources when reinstating the structure after treatment.
  • 1.1 - Interpret and extract relevant information from drawings, specifications, schedules, method statements, risk assessments and manufacturers' information.
  • 1.2 - Comply with information and/or instructions derived from risk assessments and method statements.
  • 1.3 - State the organisational procedures developed to report and rectify inappropriate information and unsuitable resources and how they are implemented.
  • 1.4 - Describe different types of information, their source and how they are interpreted in relation to:
    - drawings, specifications, schedules, method statements, risk assessments, manufacturers' information and regulations governing buildings.
2 Know how to comply with relevant legislation and official guidance when reinstating the structure after treatment.
  • 2.1 - Describe their responsibilities under current legislation and official guidance whilst working:
    - in the workplace, below ground level, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting.
  • 2.2 - Describe the organisational security procedures for tools, equipment and personal belongings in relation to site, workplace, company and operative/technician.
  • 2.3 - Explain what the accident reporting procedures are and who is responsible for making reports.
3 Maintain safe working practices when reinstating the structure after treatment.
  • 3.1 - Use health and safety control equipment and access equipment safely to carry out the activity in accordance with legislation and organisational requirements when reinstating the structure after treatment.
  • 3.2 - Explain why and when health and safety control equipment, identified by the principles of protection, should be used, relating to reinstating the structure after treatment, and the types, purpose and limitations of each type, the work situation and general work environment, in relation to:
    - collective protective measures
    - personal protective equipment (PPE)
    - respiratory protective equipment (RPE)- local exhaust ventilation (LEV).
  • 3.3 - Describe how the relevant health and safety control equipment should be used in accordance with the given instructions.
  • 3.4 - State how emergencies should be responded to in accordance with organisational authorisation and personal skills when involved with fires, spillages, injuries and other task-related hazards.
4 Select the required quantity and quality of resources for the methods of work to reinstate the structure after treatment.
  • 4.1 - Select resources associated with own work in relation to materials, components, fixings, tools and equipment.
  • 4.2 - Describe the characteristics, quality, uses, sustainability, limitations and defects associated with the resources in relation to:
    - removed components, sand, cement, lime, bricks,
    plasters, damp-proof course (DPC), fixings, fittings- hand and/or powered tools and equipment.
  • 4.3 - Describe how the resources should be used correctly and how problems associated with the resources are reported.
  • 4.4 - Explain why the organisational procedures have been developed and how they are used for the selection of required resources.
  • 4.5 - Describe any potential hazards associated with the resources and method of work.
  • 4.6 - Describe how to calculate quantity, area and wastage associated with the method/procedure to reinstate the structure after treatment.
5 Minimise the risk of damage to the work and surrounding area when reinstating the structure after treatment.
  • 5.1 - Protect the work and its surrounding area from damage in accordance with safe working practices and organisational procedures.
  • 5.2 - Minimise damage and maintain a clean work space.
  • 5.3 - Dispose of waste in accordance with legislation.
  • 5.4 - Describe how to protect work from damage and the purpose of protection in relation to general workplace activities, other occupations and adverse weather conditions.
  • 5.5 - Explain why the disposal of waste should be carried out safely in accordance with environmental responsibilities, organisational procedures, manufacturers' information, statutory regulations and official guidance.
6 Complete the work within the allocated time when reinstating the structure after treatment.
  • 6.1 - Demonstrate completion of the work within the allocated time.
  • 6.2 - State the purpose of the work programme and explain why deadlines should be kept in relation to:
    - types of progress charts, timetables and estimated times- organisational procedures for reporting circumstances which will affect the work programme.
7 Comply with the given contract information to reinstate the structure after treatment to the required specification.
  • 7.1 - Demonstrate the following work skills when reinstating the structure after treatment:
    - measuring, marking out, fitting, applying, cleaning, positioning and securing.
  • 7.2 - Reinstate the structure after wood preservation and/or damp-proofing treatments and/or wall tie replacement to given working instructions, relating to one of the following:
    - air bricks
    - masonry
    - plasterwork
    - structural timbers (wall plates, joists, flooring/decking)
    - wood preservation and/or damp-proofing only
    - non-structural components (doors, windows, skirting,
    architraves and services that have been temporarily
    moved for treatment purposes)
    - damp-proof courses- insulation.
  • 7.3 - Arrange re-commission of services (electric, gas, water) to given working instructions.
  • 7.4 - Safely use materials, hand tools, portable power tools and ancillary equipment.
  • 7.5 - Safely store the materials, tools and equipment used when reinstating the structure after treatment.
  • 7.6 -
    Describe how to apply safe work practices, follow procedures, report problems and establish the authority needed to rectify them, to:
    – reinstate structures after treatments above and below ground– insert air bricks– carry out masonry repair– rebuild (sleeper walls, piers, walls)– apply plasterwork where removed– install structural timbers (wall plates, joists, flooring/decking)– replace doors, windows, skirting, architraves– replace services that were temporarily removed for treatment purposes.– arrange the re-commission of services (electric, gas, water)
    – insert damp-proof courses
    – replace installation
    – mix mortar and/or concrete
    – clean cavities
    – stop work at the point when conjecture begins and report findings
    – use hand tools, power tools and equipment
    – use access equipment.
  • 7.7 - Describe the needs of other occupations and how to effectively communicate within a team when reinstating the structure after treatment.
  • 7.8 - Describe how to maintain the tools and equipment used when reinstating the structure after treatment.
Assessment guidance and/or requirements
This unit must be assessed in a work environment and in accordance with the ConstructionSkills‘ Consolidated Assessment Strategy for Construction and the Built Environment. Assessors for this unit must have verifiable, current industry experience and a sufficient depth of relevant occupational expertise and knowledge, and must use a combination of assessment methods as defined in the Consolidated Assessment Strategy. Workplace evidence of skills cannot be simulated.

Qualifications offering this unit

Reference Title Sector Level