Skip navigation

Reinstating Excavation and Highway Surfaces in the Workplace

Reference
H/503/9442
Level
Level 2
Credit Value
12
Guided Learning Hours
40
 
Aim
The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in Reinstating Excavation and Highway Surfaces in the Workplace within the relevant sector of industry.


Learning Outcomes Assessment Criteria
The Learner Will The Learner Can
1 Interpret the given information relating to the work and resources when reinstating excavation and highway surfaces.
  • 1.1 - Interpret and extract relevant information from drawings, risk assessments, method statements, specifications, schedules and manufacturers' information.
  • 1.2 - Comply with information and/or instructions derived from risk assessments and method statements.
  • 1.3 - Describe the organisational procedures developed to report and rectify inappropriate information and unsuitable resources and how they are implemented.
  • 1.4 - Describe different types of information, their source and how they are interpreted in relation to:
    - drawings, specifications, schedules, risk assessments, method statements, manufacturers' information and regulations governing excavations and reinstatement work on highways.
2 Know how to comply with relevant legislation and official guidance when reinstating excavation and highway surfaces.
  • 2.1 - Describe their responsibilities regarding potential accidents and health hazards, whilst working:
    - in the workplace, below ground level, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting.
  • 2.2 - Describe the organisational security procedures for tools, equipment and personal belongings in relation to site, workplace, company and operative.
  • 2.3 - Explain what the accident reporting procedures are and who is responsible for making reports.
3 Maintain safe and healthy working practices when reinstating excavation and highway surfaces.
  • 3.1 - Use health and safety control equipment safely to carry out the activity in accordance with current legislation and organisational requirements when reinstating excavation and highway surfaces.
  • 3.2 - Comply with information relating to specific risks to health when reinstating excavation and highway surfaces.
  • 3.3 - Explain why and when health and safety control equipment, identified by the principles of protection, should be used, relating to reinstating excavation and highway surfaces, and the types, purpose and limitations of each type, the work situation and general work environment, in relation to:
    - collective protective measures
    - personal protective equipment (PPE)
    - respiratory protective equipment (RPE)
    - local exhaust ventilation (LEV).
  • 3.4 - Describe how the relevant health and safety control equipment should be used in accordance with the given instructions.
  • 3.5 - Describe how emergencies should be responded to in accordance with organisational authorisation and personal skills when involved with fires, spillages, injuries and other task-related hazards.
4 Select the required quantity and quality of resources for the methods of work to reinstate excavation and highway surfaces.
  • 4.1 - Select resources associated with own work in relation to materials, components and fixings, and tools and equipment.
  • 4.2 - Describe the characteristics, quality, uses, sustainability limitations and defects associated with the resources in relation to:
    - new and re-usable materials, sub-base, road-base and pavement surface
    - cold-lay, warm lay and hot-lay bituminous materials
    - sands, jointing materials
    - concrete, blocks and flags
    - natural soil based materials
    - hand and/or powered tools and equipment.
  • 4.3 - Describe how the resources should be used correctly and how problems associated with the resources are reported.
  • 4.4 - Explain why the organisational procedures have been developed and how they are used for the selection of required resources.
  • 4.5 - Describe any potential hazards associated with the resources and methods of work.
  • 4.6 - Describe how to calculate quantity, length, area and wastage associated with the method/procedure to reinstate excavation and highway surfaces.
5 Minimise the risk of damage to the work and surrounding area when reinstating excavation and highway surfaces.
  • 5.1 - Protect the work and its surrounding area from damage in accordance with safe working practices and organisational procedures.
  • 5.2 - Minimise damage and maintain a clean work space.
  • 5.3 - Dispose of waste in accordance with current legislation.
  • 5.4 - Describe how to protect work from damage and the purpose of protection in relation to general workplace activities, other occupations and adverse weather conditions.
  • 5.5 - Explain why the disposal of waste should be carried out safely in accordance with environmental responsibilities, organisational procedures, manufacturers' information, statutory regulations and official guidance.
6 Complete the work within the allocated time when reinstating excavation and highway surfaces
  • 6.1 - Demonstrate completion of the work within the allocated time.
  • 6.2 - Describe the purpose of the work programme and explain why deadlines should be kept in relation to:
    - types of progress charts, timetables and estimated times- organisational procedures for reporting circumstances which will affect the work programme.
7 Comply with the given contract information to reinstate excavation and highway surfaces to the required specification.
  • 7.1 - Demonstrate the following work skills when reinstating excavation and highway surfaces:
    - backfilling, consolidating, laying, compacting, positioning, securing and finishing.
  • 7.2 - Reinstate excavations and highway surfaces to given working instructions, relating to two of the following:
    - sub-grades, sub-bases, road-bases
    - cold lay bituminous
    - warm lay bituminous
    - hot lay bituminous
    - concrete
    - modular.
  • 7.3 - Safely use materials, hand tools, portable power tools and ancillary equipment.
  • 7.4 - Safely store the materials, tools and equipment used when reinstating excavation and highway surfaces.
  • 7.5 - Describe how to apply safe and healthy work practices, follow procedures, report problems and establish the authority needed to rectify them, to:
    – confirm the type of ground structure for reinstatement (bituminous, concrete, modular, natural)
    – reinstate and compact backfill, sub-grades, sub-bases, road-bases pavement base for the relevant type of ground structure
    – protect service apparatus and sub-structures during reinstatement
    – reinstate the relevant type of ground surface, pavement surface, specialist surface treatments, kerbs, edge restraints, street ironwork and pavement markings
    – dispose of surplus materials use hand tools, power tools and equipment.
  • 7.6 - Describe the needs of other occupations and how to effectively communicate within a team when reinstating excavation and highway surfaces.
  • 7.7 - Describe how to maintain the tools and equipment used when reinstating excavation and highway surfaces.
Assessment guidance and/or requirements
This unit must be assessed against two of the following endorsements:
– Sub-grades, sub-bases, road-bases
– Cold lay bituminous
– Warm lay bituminous
– Hot lay bituminous
– Concrete
– Modular.

Qualifications offering this unit

Reference Title Sector Level